Changes between Version 40 and Version 41 of ReleaseProcedure


Ignore:
Timestamp:
Nov 17, 2014, 8:00:32 AM (10 years ago)
Author:
Nicklas Nordborg
Comment:

Adding instructions to update news section on front page

Legend:

Unmodified
Added
Removed
Modified
  • ReleaseProcedure

    v40 v41  
    155155  i. In section '''BASE ''devel'' ''' update link to `[milestone:A.B+1 A.B+1]`.[[br]][[br]]
    156156  i. Add a ''Base A.B'' subsection in the '''All packaged BASE releases''' section. [[br]][[br]]
     157 1. Update front page [[br]][[br]]
     158  i. Add a new entry to the '''News''' section. Remove the oldest one if the list is getting too long.[[br]][[br]]
    157159 1. If required, merge the patch release into the trunk. To avoid
    158160    confusion and minimize the risk of loosing fixes, this step is
     
    268270  i. Add a new entry to the ''Base A.B'' subsection in the '''All packaged BASE releases'''
    269271     section. [[br]][[br]]
     272 1. Update front page [[br]][[br]]
     273  i. Add a new entry to the '''News''' section. Remove the oldest one if the list is getting too long.[[br]][[br]]
    270274 1. Close the milestone associated with the release and replace `head` with appropriate
    271275    revision in log link. Add a new milestone as needed (with an associated log link like