Changes between Version 3 and Version 4 of ReleaseProcedure


Ignore:
Timestamp:
Aug 16, 2007, 9:33:25 AM (17 years ago)
Author:
Jari Häkkinen
Comment:

Working on ticket:656

Legend:

Unmodified
Added
Removed
Modified
  • ReleaseProcedure

    v3 v4  
    116116  i. In section '''BASE ''latest release'' ''' modify the svn command to
    117117{{{
    118 svn checkout http://lev.thep.lu.se/repository/BASE/tags/A.B BASE-A.B
     118svn checkout http://lev.thep.lu.se/repository/BASE/tags/A.B base-A.B
    119119}}}
    120120  i. In section '''BASE ''stable'' ''' update link to
    121121     `[milestone:A.B.1 A.B.1]` and modify the svn command to
    122122{{{
    123 svn checkout http://lev.thep.lu.se/repository/BASE/branches/A.B-stable BASE-A.B
     123svn checkout http://lev.thep.lu.se/repository/base/branches/A.B-stable base-A.B
    124124}}}
    125125  i. In section '''BASE ''devel'' ''' update link to `[milestone:A.B+1 A.B+1]`.[[br]][[br]]
     126  i. Add a ''Base A.B'' subsection in the '''All packaged BASE releases''' section. [[br]][[br]]
    126127 1. Close the [http://trac.thep.lu.se/trac/svndigest/roadmap milestone]
    127     associated with the release and replace `head` with appropriate revision. Add a new milestone as needed (with log link).
     128    associated with the release and replace `head` with appropriate revision. Add a new milestone as
     129    needed (with an associated log link like ''Revision Log: log:branches/webservices@3001:head'' in the
     130    description field).
    128131
    129132